Jeff Sage-Lauck, PE

2/16/2018
Eugene, OR

Position Desired

Mechanical Engineering
Eugene, OR
Yes

Resume

**SUMMARY**
Experienced engineer with M.S. in Mechanical Engineering. Specialization in building energy simulation, HVAC design, renewable energy technologies, and data collection and analysis. Skilled at identifying, analyzing and creatively solving problems. Strong mechanical aptitude and a passion for sustainability. Capable of building and maintaining working relationships with all levels of management and employees.


**ACCOMPLISHMENTS**
-Proficiency in building energy modeling using EnergyPlus, eQuest, and IES Virtual Environment
-Designed a variety of HVAC systems including standard VAV, dual duct VAV, and VRF
-Competence with instrumentation and collection of building performance data
-Created a Global Assembly and Test Cost Forecasting model for a $1.8B semiconductor company
-Developed an automated lot picking system for assembly releases and automated report generator to reduce labor from one hour to five minutes


**PROFESSIONAL HISTORY**
SAGE-LAUCK ENERGY ANALYSIS - Portland, Oregon
Owner, Principal (September 2016-Present)
-Building energy simulation for LEED certification, code compliance and utility incentive programs
-Data analysis in Excel
-Custom Excel spreadsheet creation

INTERFACE ENGINEERING - Portland, Oregon
Energy Analyst/Mechanical Engineer (July 2013-September 2016)
-Simulated energy consumption of commercial buildings using IES VE and eQuest
-Calculated heating and cooling loads and designed duct layout for commercial buildings
-Selected appropriate pumps, fans, and heating and cooling equipment for HVAC applications
-Ensured energy code compliance of envelope and mechanical systems for commercial buildings
-Coordinated equipment locations with architects and engineers from other disciplines

PORTLAND STATE UNIVERSITY - Portland, Oregon
Laboratory Manager and Graduate Research Assistant, Green Building Research Laboratory (September 2011-Present)
-Mentor undergraduate research assistants
-Coordinate staff availability to accomplish lab projects and goals
-Interface with School of Architecture and assist in data collection strategies
-Facilitate laboratory equipment lending and rental program
-Conduct laboratory tours
-Generate quarterly usage reports
-Manage laboratory equipment maintenance and upkeep
-Collect and analyze building performance data for a Passive House duplex
-Evaluate performance of macro-encapsulated Phase Change Material in a Passive House duplex
-Model and analyze building performance using EnergyPlus simulation software
-Conduct “hotbox” tests to determine the U-factor of various windows and window products
-Troubleshoot problems with instrumentation and data acquisition

ATMEL CORPORATION - Colorado Springs, Colorado
Operations Planner (June 2007-September 2011)
-Developed and maintained cost model for assembly and test phases of semiconductor production
-Generated world-wide monthly cost forecasts for assembly and test phases of production
-Analyzed actual versus forecasted cost and explained significant deltas
-Helped develop and test subcontractor flat files for business-to-business data transfer
-Coordinated assembly and test of integrated circuits at off-shore subcontractors
-Presented key performance metrics to Business Units on a quarterly basis
-Improved efficiency of in-house processes for report generation and material releases into assembly by developing automated software solutions

NORTHWINDS PUBLISHING & PRINTING - Great Falls, Montana
Commercial Sales & Prepress Manager (August 2005-March 2006)
-Managed Commercial Sales and Prepress departments
-Resolved customer issues with quality and printing errors
-Organized production schedule and ordered paper for print jobs
-Presented year-end revenue report to Board of Directors
-Performed annual employee performance reviews for six direct reports
-Modified in-house estimating spreadsheet using production and waste data to provide more-accurate estimates

Web Press and Scheduling Manager (September 2004-August 2005)
-Managed two four-person press crews in a two-shift web offset printing operation
-Supervised production scheduling
-Implemented finite capacity scheduling
-Resolved quality, scheduling, and capacity issues in a deadline-oriented environment
Login or Register to view the full resume.